Currently under construction and due for completion in Q4 2025, the Sidney Sussex Building will comprise 55,855 sq ft GIA of laboratory / write up space over three floors, split into 10 fully fitted suites.
Suite Specification
Fitted lab space with benches/sinks and fitted fume hoods (with capability for additional fume hoods).
Raised floors to offices and solid vinyl floors in laboratory areas.
Data and power cabled.
Heating/cooling system.
Suspended ceilings and LED lighting.
Suites capable of being interconnected.
Individual private plant rooms at the same level as suites with independent services per suite.
Building Specification
Ground floor direct external access points.
8 showers within the building.
36 ‘super loos’, plus dedicated disabled facilities on each floor.
Passenger lift.
Goods lift.
Communal meeting rooms onsecond floor.
Photovoltaic cells on the roof.
External stores, generator and waste facilities.
Electric vehicle charging points.
Car parking.
Floor Plans
Find out more details of the building layout and how it could work for you.